Pixel perfect
An image becomes a grid of squares, each in a single colour.
Whole squares, colour from a declared rule, zero smoothing — and a counter that re-scans every square before handing you the file. Image preparation, historic palettes, lossless PNG export.
Open Pixel perfectRound timer
The bell, the ten-second clap and the voice, for a whole boxing class.
A session in blocks — rope, pads, bag, sparring — each with its own rounds and rest, eight ready-made sessions, and a full screen you can read from the back of the gym. The session fits in a link: nothing is saved.
Open the timerFind your collective agreement
By your trade, your company or a number — even when the employer has declared nothing.
“Plombier” finds the building-sector agreements, two questions separate worker, ETAM and manager, and the essentials fit on one page — probation, notice, family leave, with the article that says so.
Find my agreementWork out your notice period
Resignation or dismissal: the duration, its source and the last day.
Your agreement, your category, your length of service to the month: the line that applies, the legal minimum when the agreement provides less, and the end date if you give the start date. Nothing is sent.
Notice on resignationNotice on dismissal
Clay soil
Is a soil survey required? The 2026 map, read for your land.
A cadastral plot, an address or your location: the clay exposure on the official French map, and what the law requires to sell, buy, build or extend — article by article.
Check my landVAT on building work
5.5%, 10% or 20%? The rate for your quote, and the statement to put on it.
A few questions about the work and the home: the rate, the tax-code article behind it, what stays at the standard rate, and the statement that replaced the certificate — ready to copy. Nothing is sent.
Find my ratePermit or declaration
Shed, extension, pool, fence: a permit, a declaration, or nothing?
Project by project, each with its thresholds and articles of the French planning code. Give the address if you like: the local plan’s zone and historic monuments change the answer, and the tool reads them.
See the formalityCheck a company
Before signing a quote: trading, since when, RGE-qualified for your work and until when?
A SIRET is enough: the company directory and ADEME’s RGE list, read at the time of the search, field by field with their dates. Then what no register says, such as the ten-year liability insurance.
CheckWorking days
How many working days between two dates, or which day at the end of a time limit?
Working, business and calendar days, with the French Labour Code’s public holidays named one by one — Alsace-Moselle and overseas included. The calculation runs in the page, without calling any service.
Count the daysBT price revision
A building-work price revised by your contract’s BT index, fixed term included.
The BT01 to BT53 indices taken from INSEE, the coefficient and the two values behind it; and the updating of a fixed price in a public contract, three months before work starts.
Revise a priceRent review
The maximum reviewed rent by the IRL — and when the law forbids reviewing it.
The right index quarter and its publication date, the landlord’s one-year limit, and the freeze on homes rated F or G since 2022.
Review a rentBuild your menu
The price of each dish, what it earns you, and the menu ready to display.
Food cost, ratio and multiplier dish by dish, the price that meets your target, the cost of your set menus — then the menu with its mandatory French notices and the fourteen-allergen chart. Nothing is sent.
Build my menu