The 2026 map

Clay soil:
is a soil survey required?

Since 1 July 2026, a new map classifies France by its exposure to clay shrink-swell. Identify the land: the tool reads the official map and tells you what French law requires — to sell, buy, build or extend.

Where is the land?

Three ways to say it. The plot is the most reliable: it appears on the title deed and on the property tax notice.

The town goes to the French government’s administrative directory, the plot to the IGN land registry, then the point to Géorisques (BRGM). Nothing is kept here.

What the law requires in an exposed zone

Medium or high exposure only (article R132-3 of the French Construction and Housing Code). For sale agreements, sales and building contracts signed since 1 July 2026, the map of the order of 9 January 2026 applies; before that date, the 2020 map did.

I am selling building land

You must provide a preliminary geotechnical survey (« étude géotechnique préalable »). It is attached to the sale agreement — or, failing that, to the deed of sale — and then follows the land through every sale.

It remains valid for thirty years if the ground has not been disturbed.

Exception: land in an area where planning rules do not allow detached houses to be built.

The legal texts: L132-5, R132-6

I am buying building land

The seller must give you the preliminary geotechnical survey, attached to the sale agreement or the deed: check that it is there.

If you buy a house built under these rules, the surveys made for its construction are attached to the sale.

The legal texts: L132-5, L132-8

I am having a house built

Before signing the building or project-management contract, you pass the land survey on to the builder. If there is none, you provide an equivalent one, or a survey that takes the house’s position and features into account.

The builder then follows that design survey, or applies specific building techniques: foundations and structure that limit deformation, control of rainwater and vegetation near the house, and reduced heat exchange with the ground.

These rules cover buildings with two dwellings at most.

The legal texts: L132-6, L132-7, R132-8

I am extending or altering a house

The same obligations apply to work that affects the foundations, the structure, water drainage or heat exchange between the house and the ground.

They do not apply to an extension — conservatories and garages included — of less than 20 m² that is structurally separate from the house.

The legal texts: L132-6, L132-7, R132-7

With low or residual exposure, none of these obligations apply.

An existing house with high exposure?

The Fonds prévention argile, set up by the French government, helps owners pay for prevention work — for now in eleven pilot départements. Its conditions are set by ministerial order and may change: they are published on its website.

Check eligibility on the Fonds website

Before you build

Two other tools from the studio serve the same project: whether you need a building permit or a prior declaration, and what the registers say about the company before you sign its quote.

Permit or declaration?Check the company before signing

Where the answers come from

The exposure comes from Géorisques (BRGM): the map of the order of 9 January 2026. On 12 November 2026 we compared it at 57 randomly drawn points with the official Fonds prévention argile tool: no difference.

The obligations come from the French Construction and Housing Code, articles L132-4 to L132-9 and R132-3 to R132-8, read on Légifrance on 12 November 2026.

This tool says what the map classifies and what the Code provides. It replaces neither a soil survey nor the notaire, who checks the documents attached to the sale.